My Capacity
Your own row from the daily capacity report: how much capacity you have in the upcoming two-week window (next Monday through the following Friday), how much is already planned in Tempo, and what is committed but not yet scheduled.
Metrics
| Metric | Definition |
|---|---|
| Capacity | Your working hours in the window, from your Tempo workload scheme (holidays and FTE % included). |
| Planned | Hours already scheduled in Tempo plans inside the window. |
| Unscheduled | Remaining estimates on Jira stories assigned to you that have no planned dates yet. |
| Capacity left | Capacity − (Planned + Unscheduled). |
| Flag | 🔴 OVER (committed above capacity) · ⚠️ UNDER (lots of capacity left) · ✅ OK · ⚪ NO_SCHEDULE (Tempo has no working days configured for you — ask for a workload scheme). |
Planned work
Every Tempo plan overlapping the window: Jira story (linked), start/end dates, the planned hours that fall inside the window, plus the story’s total logged hours and remaining estimate from Jira. Project-level plans show the plan description instead of a story link.
Unscheduled issues
Stories assigned to you with a remaining estimate but no planned dates — schedule them in Tempo or clear the estimate.
The report refreshes daily at 10:00. Your row is matched by your Jira account (resolved from your sign-in email) — if the page says there is no data for you, you are probably not a member of a capacity team in Tempo.