The story-hygiene findings from the daily capacity report, filtered to stories assigned to you or planned for you in Tempo. Empty checks are hidden; a clean slate shows a success note.
The checks
Estimation
- In flight without estimate — you’re working on it (or it’s assigned), but it has no original estimate.
- Estimate raised mid-flight — remaining exceeds the original estimate; re-estimate properly instead.
- Story too big — original estimate of 40 h or more; consider splitting.
Dates & status
- Due date passed — overdue and not done.
- In Progress too long — in progress for more than 30 days.
- Time logged on a not-started story — worklogs exist but the status is still To Do/READY.
- Stalled In Progress — no activity for 14+ days.
Tempo ↔ Jira consistency
- Tempo plan ended, story still open — the planner thinks you’re done; the story says otherwise.
- Tempo plan started, story not begun — planned to start in the past, still To Do.
- Planned but nothing left to burn — a plan reserves your time for a story with no remaining estimate.
- Plan assignee ≠ Jira assignee — you’re planned on someone else’s story (or vice versa).
- Planned but unassigned in Jira.
Each finding links straight to the Jira story. Fixing them keeps the capacity report (and your own numbers) honest.